Advanced Asphalt Technologies, LLC Logo Header 

AAT HOME

ABOUT AAT

MODIFIED ASPHALT

  • Benefits
  • FAQs
  • Projects

    LAB TESTING

  • Tests
  • Equipment
  • Projects

    ENGINEERING

  • Projects

    CONTACT US

  • FREQUENTLY ASKED QUESTIONS

    How long will your set-up take?

    Fast: Our mobile blending system is usually set up in just one day.

    Do I have to provide you with piping?

    No: All labor, piping and test equipment is provided by AAT. All we require are points of connection to your existing piping.

    Can I run other projects at the same time?

    Yes: Our field technicians set up the equipment in a way that does not require continual or dedicated operation. You can run other projects by merely turning valves.

    Will my heating system have to keep your equipment hot?

    No: AAT’s blenders and storage tanks are equipped with their own heating systems to maintain the correct storage temperatures.

    Will your product separate and damage my storage tanks?

    No: Unlike other processes, our product is never introduced into your storage tanks. The constant agitation in our heated storage tanks prevents polymer separation.